Monday, April 28, 2008

Items left to complete

Things I'm working on:

  • I'm doing the second cut of polishing (with a year in between). It's looking good.
  • Running propane lines to H2O heater, stove, fridge, and fireplace.
  • Install vent for fridge.
  • Install vent for fireplace.
  • Installing 12v Air pump.
  • Installing grey water drain lines.
  • I still need to install diamond plate (this is in my outside storage hatch - complete) and,
  • Install the outside door seal on the entry door

I am getting there.

1 comment:

Frank Yensan said...

see there it is... my proof that Rob lost the throwdown and I am the true winner.